Techinical Bullein on Hydrography
vol.9 (January, 1991)
[ Previous ] [ List ] [ Next ]
Contents
- Hydrographic Survey Vessel "MEIYO"
, p.1 - Collection of Tide/Wave Data by Using ARGOS System
, p.14 - Preliminary Report of Continental Shelf Surveys of "Nisi-Sitito Ridge" Quadrangle
, p.19 - Preliminary Report of Continental Shelf Surveys of "Kosyu Seamount" Quadrangle
, p.26 - Preliminary Report of Continental Shelf Surveys of "The South Area of Sikoku" Quadrangle
, p.32 - Development of Automatic ART System
, p.39 - Hydrographic Data Processing Using by Personal Computer
, p.45 - Automatic Data Processing of Hydrographic Survey for R.M.S.Hqs.
, p.52 - Observation of Coastal Circulation of Tokyo Bay in Summer Prediction of Wind-Driven Currents and Mass Transport in an Enclosed Sea
, p.67
(4.1MB)
Tide Gauge Project in Sarawak, MALAYSIA
, p.77
[ Previous ] [ List ] [ Next ]